decentrahomes.com

Casa Dos Hermanas, a multi-unit building by Decentra Homes on the hillside of Altos de Flamingo

Commercial and multi-unit construction in Costa Rica

Boutique hotels, rental villas, multi-unit buildings and retail, designed, permitted and built by one team.

Projects start at $350,000 USD

Rated 5.0 from 12 Google reviews

A building that earns income has to be designed around how it will run, not only how it will look.

We plan rental and commercial buildings with the operation in mind: guest flow, separate units, storage, back-of-house, parking and maintenance access.

Casa Dos Hermanas, our showroom in Altos de Flamingo, is a multi-unit building of separate units with a shared pool deck. We also build larger developments, and can source the land for them: we work directly with landowners and have a large network across Costa Rica. Qualified clients can finance through our third-party lending partner.

casa dos hermanas street
Casa Dos Hermanas from the street
casa dos hermanas pool aerial
Shared pool deck from above

How a commercial project runs

  1. Land and feasibility

    We source land through landowners we work with directly, or check yours: zoning, water, access and a first budget for the use you have in mind.

  2. Design

    Layouts built around operations, then engineering and a detailed budget.

  3. Permits

    CFIA plans, municipal permits and any environmental review the project needs.

  4. Construction

    A schedule that protects your opening date, with regular reporting.

  5. Handover

    Systems commissioned, documentation complete and the building ready to operate.

What we build

  • Hospitality

    Boutique hotels, villas and guest houses.

  • Multi-unit residential

    Apartments, townhomes and buildings with separate units for rental or sale.

  • Retail and offices

    Shops, showrooms and small offices.

Where commercial building is growing

CFIA permit data from January 2021 to June 2025 shows ten cantons account for more than half of the commercial and industrial area permitted in Costa Rica. Santa Cruz, the municipality for Playa Flamingo, is one of them. It was also among the top three cantons for new house permits in the first half of 2025.

Our showroom is in Altos de Flamingo, in Santa Cruz canton, and we build commercial and multi-unit projects anywhere in the country.

Approvals a commercial project needs

Every project is different, and we scope the list for your site during feasibility. These are the usual approvals.

  • CFIA plans

    Plans approved through the CFIA, as for every building.

  • Municipal permit

    Issued by the municipality, with a SETENA environmental review where the project requires one.

  • Ministry of Health

    Approvals for food service and wellness facilities.

  • ICT tourism declaration

    Free and voluntary for hotels and other tourism businesses that meet ICT requirements. A boutique hotel needs at least 5 rooms. It does not grant tax exemptions by itself.

  • Maritime zone

    Coastal sites need a maritime zone assessment before design.

“We have had a great experience with Decentra. Their follow up skills are impeccable and they are a one stop shop for all phases of your build.”

James Whitley, on Google

“I engaged with Sean and the owner Sergio to obtain building costs for a residential project in the mountains of the Central Valley. I found them to be very welcoming, informative and accommodating.”

Paul Ziman, on Google

Questions about commercial projects

Do you build rental properties?

Yes. We design and build villas and multi-unit buildings for rental, planned around how they will be run.

Do larger projects need extra permits?

Often. Larger buildings can need environmental review, stormwater plans and road or river alignments. We scope these during feasibility.

Can you find land for a development?

Yes. We work directly with landowners and have a large network across Costa Rica, so we can source a site that suits your project and check it before you buy.

Is financing available?

Yes, through a third-party lending partner, for qualified clients. Ask us on WhatsApp and we will put you in touch.

What is the minimum project size?

Our projects start at $350,000.

What permits does a hotel need in Costa Rica?

CFIA-approved plans, a municipal building permit, a SETENA environmental review where required, and Ministry of Health approvals for food service and wellness areas. An ICT tourism declaration is optional. We scope the full list for your site during feasibility.

What is an ICT tourism declaration?

A free, voluntary recognition from the Costa Rica Tourism Board for hotels and other tourism businesses that meet its technical, financial and legal requirements. A boutique hotel needs at least 5 rooms. It brings ICT training and promotion, but no tax exemption by itself.

Where is commercial construction growing in Costa Rica?

CFIA permit data shows ten cantons, including Alajuela, San José, Cartago and Santa Cruz in Guanacaste, account for more than half of the commercial and industrial area permitted from 2021 to mid 2025.

Tell us about your project

The fastest way to reach us is WhatsApp. Or send the form and we reply within one business day.

Projects start at $350,000 USD

Showroom
Altos de Flamingo, Playa Flamingo, Guanacaste, Costa Rica, by appointment
Licensing
CFIA certified under SIM SRL

Projects start at $350,000 USD. We reply within one business day.

WhatsApp