decentrahomes.com

Soil study crew with a drilling tripod on a dry-season hillside lot in Guanacaste, before construction

Land consulting before you buy in Costa Rica

We check the lot, the survey, the soil, the zoning and the water letter, so you buy land you can actually build on.

Minimum construction budget $350,000 USD, before land

The most expensive mistake in a Costa Rica build happens before construction: buying the wrong lot.

A view lot can hide a slope that needs retaining walls, soil that needs deep foundations, a road that floods, or no water connection at all. None of that shows up in a listing.

Our consulting puts a builder, an engineer and a CFIA-licensed architect on the lot before you sign. If you go ahead with your build, the consulting fee is credited to the construction. Surveys, soil studies and other studies are paid separately.

Soil study crew with a drilling tripod on a dry-season hillside lot in Guanacaste
Topographic survey on a hillside lot
Drilling rig taking soil samples on a hillside lot
Soil study: sampling before design
Soil study crew on a wooded hillside lot in Guanacaste
Soil study crew on a wooded hillside lot in Guanacaste

How a lot check works

  1. Shortlist

    Send us the listings or the area you like. We flag the obvious problems before anyone travels.

  2. Site visit

    We walk the lot with you, or for you on video: access, slope, drainage, neighbours, views and sun.

  3. Topographic survey

    Exact levels and boundaries, so the design fits the land and the budget includes the earthworks.

  4. Soil study

    Bearing capacity and soil type, which decide the foundation and its cost.

  5. Zoning, access and water

    Land-use certificate, setbacks, maritime zone and park buffers, road access and the water availability letter.

  6. Written report

    What can be built, what it will take and what it is likely to cost, ready before you sign.

What we check on every lot

  • Can it be permitted?

    Zoning, setbacks, height limits, the maritime zone and protected-area buffers, checked with the municipality.

  • Is there water?

    Many coastal water boards are at capacity. We confirm the water letter, or what a well or storage would take, in writing.

  • What will the ground cost?

    Slope, rock, retaining walls, drainage and access roads, priced from the survey and the soil study.

Consulting fee credited to your build

You pay for the consulting up front. If you go ahead and build with us, the consulting fee is credited to your construction contract.

Topographic surveys, soil studies and other third-party studies are paid separately and are not credited. If you decide not to build with us, the report is yours to use with any builder.

  • Lot shortlist and site visit
  • Topographic survey and soil study ordered
  • Zoning and land-use certificate checked
  • Water availability letter confirmed
  • Written report with a first budget

Topographic survey or plano catastrado?

They are different documents. The plano catastrado is the registered survey map of the lot, on record at the National Registry. You need it to buy, transfer or mortgage land, and its area must match the title.

A topographic survey maps the levels, slopes and features of the land, so the house, the driveway and the earthworks can be designed and priced. We have the boundaries checked against the plano catastrado by a surveyor who does not work for the seller, then order the topographic survey for design.

Typical prices: a topographic survey with contour lines runs $1,000 to $2,000, boundary marking alone $400 to $800, and a soil study with 2 to 3 SPT borings on a house lot $1,200 to $2,500. Large or steep lots cost more, and we confirm the price after seeing the lot. They are paid separately from our consulting fee.

Documents to ask for before you buy

  • Title report

    A certified title search showing the owner, liens, annotations and easements.

  • Plano catastrado

    The registered survey map, with the same area as the title.

  • Land-use certificate

    The uso de suelo from the municipality: permitted use, density and subdivision limits.

  • Water availability

    A letter from AyA or the local ASADA, or a clear path to a concession.

  • River alignment

    INVU's alineamiento fluvial when a river or stream borders the lot.

  • Maritime zone status

    Whether any part of the lot is in the maritime zone, where land is held by concession, not title.

  • Taxes paid

    Proof that municipal property taxes are up to date.

Google reviews

5.0★★★★★19 Google reviewsSee all reviews on Google (opens in a new tab)
★★★★★

“We have had a great experience with Decentra. Their follow up skills are impeccable and they are a one stop shop for all phases of your build.”

James Whitley 5-star Google review Read it on Google (opens in a new tab)
★★★★★

“I engaged with Sean and the owner Sergio to obtain building costs for a residential project I was considering in the mountains of the Central Valley. I found them to be very welcoming, informative, accommodating…”

Paul Ziman 5-star Google review Read it on Google (opens in a new tab)

Questions about land consulting

What does land and construction consulting include?

We help you shortlist lots, inspect them on site, order a topographic survey and soil study, check zoning, access and the water letter, and give you a written report before you buy.

Is the consulting fee credited if I build with you?

Yes. If you go ahead with the build, your consulting fee is credited to your construction project. Topographic surveys, soil studies and other studies are paid separately and are not credited.

Can you apply for the water letter and electricity for me?

Yes. We can prepare and submit the water availability letter and electricity applications on your behalf.

Do I have to build with you after a consultation?

No. The consultation stands on its own, and the report is yours to use with any builder.

How much does a topographic survey cost in Costa Rica?

It depends on the size, slope and vegetation of the lot. A topographic survey with contour lines usually runs $1,000 to $2,000, and boundary marking alone $400 to $800. Large or steep lots cost more. We confirm the price after seeing the lot, and it is paid separately from our consulting fee.

What is a plano catastrado?

The registered survey map of a property, on record at the National Registry. It shows the boundaries and the area, and you need it to buy, transfer or mortgage land.

Can foreigners buy land in Costa Rica?

Yes. Foreigners can buy titled land. Coastal land in the maritime zone is held by concession, not title, and a foreigner needs five years of continuous residence to hold a concession directly.

What property tax will I pay on land in Costa Rica?

Municipal property tax is 0.25% of the registered value a year, payable quarterly. The municipality does not send a bill, so set up payment as soon as you buy.

Tell us about your project

The fastest way to reach us is WhatsApp. Or send the form and we reply within one business day.

Minimum construction budget for new builds $350,000 USD, before land

Showroom
Altos de Flamingo, Playa Flamingo, Guanacaste, Costa Rica, by appointment
Licensing
CFIA certified under SANYC Ingeniería

Minimum construction budget for new builds: $350,000 USD, before land. Renovations are quoted by scope. We reply within one business day.

WhatsApp